CONSTRUCTION DOCUMENTS At this point, we will prepare your construction documents. These are the detailed drawings and specifications which the contractor will use to build the project. These drawings and specifications become part of the contract. When construction documents are finished, you are ready to hire the general contractor or builder.
This phase constitutes 40% of the basic architectural service. The structural engineer will perform the majority of his/her work at the this point. The Title 24 consultant will perform their energy analysis. Depending on the nature of the project, other consultants may be included (HVAC, Civil, etc.) < prev next >